The challenge
Grant Thornton recently acted as financial and commercial advisor to MKCC, supporting the procurement of a Strategic Delivery Partner for the Council’s existing Milton Keynes Waste Recovery Park (MKWRP).
The MKWRP currently combines three separate facilities:
- A Mechanical Treatment recycling plant;
- An Advanced Thermal Treatment plant;
- An Anaerobic Digestion plant.
As the sole facility managing the waste from a growing population of over 300,000 residents, maximisation of availability and throughput was critical for the new contract.
The Council required a new private sector partner to operate and invest in the three MKWRP facilities over a 10- to 15-year contract period.
Grant Thornton helped develop an innovative Strategic Delivery Partner model that was suited to the complex handover of the existing facility to a new operator, and the need for ongoing investment and incentivisation. Traditional PFI-based contractual models are not well-suited to such circumstances, where adaptability and incentivisation is key.
The commercial model incentivises the new operator to maximise availability, optimise outputs (electricity, recyclates, by-products), identify new investment opportunities, and deliver capex and maintenance works effectively.
How we helped
The procurement was a multi-year process, with ongoing Competitive Dialogue with the market to ensure market appetite and that the model developed was aligned with supplier capabilities.
Grant Thornton supported the Council to:
- Design innovative, novel financial/commercial risk-sharing mechanisms;
- Negotiate key commercial terms and financial mechanisms with bidders throughout the Competitive Dialogue stages;
- Draft two comprehensive Payment Mechanisms for the two separate project phases, where risk shifts from the Council to the Contractor after a Familiarisation Phase;
- Develop of a suite of detailed yet user-friendly financial documentation, including a financial response template model, and financial/commercial guidance; and
- Robustly assess each bidder’s financial strength, commercial proposals, and strategic collaboration approach.
The results
After a highly competitive tendering process, Grant Thornton helped MKCC identify Suez as the preferred strategic partner.